Clarity Construction, design-build general contractorClarity Construction, design-build general contractor
New home on a hillside lot with a poured driveway, terraced planting and a stepped path

New Home Construction across the Bay Area

A house built from the dirt up, exactly to your plan. The largest thing we do and the one where a fixed price and a schedule you can trust matter most.

CSLB #1124235Since 1989300+ five star reviews

The short version

New home construction across the Bay Area, from the lot to the keys.

Building new in the Bay Area means clearing planning, soils, drainage, utilities and Title 24 before a shovel moves. Owners who get burned are almost always the ones who started construction before those were settled.

As custom home builders we take on a small number of new builds each year, so each one gets a senior team the whole way through. One contract covers the lot review, the design, the permits, the build and the final walkthrough.

How a project runs, step by step

New home on a hillside lot with a poured driveway, terraced planting and a stepped path

Scope

What a Clarity new remodel includes.

  • Lot and feasibility review Zoning, setbacks, soils, drainage, utility availability and what the lot really allows.
  • Architecture and engineering Full drawings, structural and civil engineering, and Title 24 energy compliance.
  • Entitlements and permits Planning approval, building permits, and every agency sign off required.
  • Site work and foundation Demolition if needed, grading, drainage, utilities and an engineered foundation.
  • Structure and envelope Framing, roofing, windows, doors, weather barrier, siding or stucco.
  • Complete systems Electrical service, plumbing, HVAC, solar readiness and low voltage.
  • Full interior Insulation, drywall, cabinetry, stone, flooring, trim, tile, paint and fixtures.
  • Landscape and handover Hardscape, driveway, fencing, planting and the certificate of occupancy.

Typical costs

New Home Construction costs in the Bay Area.

$550 to $900 per square foot

Site conditions move this number more than finishes do. A flat lot with utilities at the street is far cheaper than a sloped lot needing retaining walls and a long utility run.

Entry

Standard build

$550 to $650 / sq ft

Flat lot, utilities at the street, quality production level finishes.

Most common

Custom build

$650 to $780 / sq ft

Custom cabinetry, slab stone, better windows, designed lighting throughout.

Top of the range

High specification

$780 to $900+ / sq ft

Sloped or difficult lot, structural steel, imported stone, full automation.

Typical ranges for completed Bay Area projects, not quotes. Your fixed price comes after we walk the space.

300+ five star reviews

Reviews from Bay Area homeowners.

E
Esther L.Kitchen remodel · April 2026
Houzz
Our kitchen remodel completely changed how we use the space. Ronnie spent time going through layout options and explaining what would actually work, and Jael helped refine the design so it felt both functional and clean… The end result feels open, functional, and easy to use every day.
S
Stephen D.Bedroom addition · April 2026
Houzz
We hired Clarity Construction for a bedroom addition when our family started outgrowing the house. Daniel walked the space with us and helped rethink the layout so it wouldn't feel like an add-on… Now that it's done, the room blends in so well it feels like it's always been part of the house.
M
Mike C.Kitchen renovation · March 2026
Houzz
Clarity recently completed a full kitchen renovation for us, and the transformation is remarkable. What was once dark and outdated is now bright, open, and highly functional. Daniel remained hands-on throughout the project and handled an unexpected plumbing issue calmly and efficiently… The project stayed on budget and on schedule.
K
Kevin A.Kitchen remodel · March 2026
Houzz
Daniel oversaw the installation and ensured everything ran efficiently. The team maintained a clean workspace and respected our home throughout the project. The end result is modern, functional, and beautifully finished. We absolutely love how everything came together.

FAQ

Questions.

The 2026 energy code, built in.

Homes permitted from January 2026 are designed under California's newest energy code, and its baseline is electric: heat pumps for space and water heating, high-performance glazing and insulation, solar-ready and, for larger electrical services, battery-storage-ready wiring. We design to it natively rather than retrofitting compliance at plan check, which is one less round of corrections and a house that is cheaper to run from the first bill.

How a fixed price works on a whole house.

A custom home is hundreds of decisions, so we sequence them: lot review and feasibility first, then a line by line contract that fixes the price, then design to that number rather than discovering the budget afterward, all before ground breaks. Progress payments follow work actually done, which is exactly the discipline you want in the largest purchase of your life.

Why our new homes start with the lot.

Hillside or flat, tree cover, utilities, soil and setbacks decide more of a home's cost than the finishes do. We walk the lot before we draw, engineer to what the ground actually is, and tell you the hard parts up front. The house on this page's photographs sits on a slope most builders passed on. It is our favorite kind of problem.

What does it cost to build a custom home in the Bay Area?

Construction runs $550 to $900 per square foot depending on the lot and the specification. A 2,500 square foot home therefore lands roughly between $1.4M and $2.25M for construction. That excludes the land, and it excludes site work on difficult lots, which we price separately after the soils report.

How long does it take to build a house?

Longer than a remodel, and driven far more by entitlements and plan check than by the building itself. Any firm number quoted before someone has walked your lot is a guess, so we will not print one here. What we will commit to is pace on our side: our own crews, sequenced so the build never sits idle waiting on a trade. Call us and we will walk the realistic path for your lot.

Do you build on a fixed price or cost plus?

Fixed price, once the drawings are complete and the specification is set. Cost plus contracts move the risk of every unknown onto you, and we do not think that is fair on a project this size. Anything that genuinely cannot be priced before ground breaks is flagged as a potential change order with an estimated range before you sign, so nothing is hidden.

Can I build a second unit on the same lot?

Often yes. Many Bay Area lots can carry a main house plus an ADU, and designing them together from the start is far cheaper than adding the ADU later. We check what your parcel allows during the feasibility review.

Do you demolish an existing house first?

Yes, when that is the plan. Demolition, disconnection of utilities, and disposal are all part of the contract. On some lots keeping a portion of the existing structure has real permitting advantages, and we will tell you when that is worth considering.

Get in touch

Contact us.

Tell us what you are planning. We will walk the space and put a fixed price in writing.

We call back within one business day, walk the space with you, and put a fixed price in writing. Nothing to sign before then.

Name, phone and email are all we need. The rest helps us call you back prepared.

No pressure, no hard sell. By sending this form you agree to our privacy policy.

Thank you. We have your details.

One of our project leads will call you within one business day. If you need us sooner, call (408) 443-2393.