
ADU construction across the Bay Area
A second home on the lot you already own. California law is on your side, and a well-built ADU houses family, earns rent, or both.
The short version
ADU construction, from lot check to lockup.
State law has removed most of the local rules that used to block ADUs: cities must act on a compliant application within 60 days, and owner-occupancy requirements are largely gone. What still trips projects up is the lot itself: utility connections, fire sprinklers, setbacks and separate metering. We plan for those first.
We will not print a timeline here and have it be wrong for your lot. Utility connections, setbacks, fire access and the city's workload all move the date; the 60-day state deadline helps. Once the permit is in hand our own crews build the shell quickly, because nothing is subcontracted out.

Scope
What an ADU project includes.
- Feasibility and siting What the lot allows, and what the connections will cost.
- Plans and engineering A full architectural set, structural calculations and Title 24 energy compliance.
- Permit management Submittal, plan-check corrections and every inspection through final.
- Site work and foundation Grading, drainage and a foundation engineered for the soil.
- The full structure Framing, roofing, siding, windows, doors, insulation and drywall.
- Utilities Water, sewer, gas and electrical, with separate metering on request.
- Kitchen and bathroom Built to the same standard as the main house.
- Finish and handover Flooring, paint, fixtures, appliances and the certificate of occupancy.
Typical costs
ADU construction costs in the Bay Area.
$190,000 to $500,000
A garage conversion is the least expensive route. A detached unit costs the most because it needs its own foundation, roof and connections.
Garage conversion ADU
The existing structure converted and insulated, with a kitchen and bath.
Attached ADU
Built onto the main house, sharing one wall and some utility runs.
Detached ADU
A new standalone structure on its own foundation.
Typical ranges for completed Bay Area projects, not quotes. Your fixed price comes after we walk the lot.
How it works
Five steps, and you always know which one you are on.
The walkthrough
Free, about an hour, at your home.
We come to you, look at the space, and talk about what you actually want. You get an honest range on the spot, and there is no sales pitch at the end of it.
The contract and your price
Itemized, fixed, in writing.
An itemized breakdown of what every part of your project costs, a schedule for how long the work will take, and a clear payment structure, all in writing before anything begins. Read it closely and ask us anything. A contract you fully understand on day one is why the project ends with no surprises on the final bill.
Design and drawings
Decided on paper, while changes are still easy.
Measured plans and elevations of your space, drawn with you, so you can review the finished design before a single wall is touched. You approve it, and only then does the build begin.
Permits and build
We pull them, we meet the inspector.
We handle the permits with your city, schedule the inspections and build with our own crews. You get a weekly update, a project manager with a direct number, and a site we sweep every evening.
Walkthrough and warranty
The punch list, cleared.
We walk the finished job with you, clear the punch list, and hand over the warranty. And if you ever need us afterward, we will be right here, as we have been since 1989.
300+ five star reviews
Reviews from Bay Area homeowners.
FAQ
Questions.
California ADU law is on your side.
Approval is ministerial, with no hearings and no discretionary review, and the city must decide a complete application within 60 days. Side and rear setbacks are capped at four feet. Every lot must be allowed at least 850 square feet, or 1,000 for two or more bedrooms, and units under 750 square feet are exempt from local impact fees. We design to these rules from day one.
Pre-approved plans.
San Jose, Santa Clara, Sunnyvale, Mountain View and Cupertino run pre-approved ADU plan programs, so review covers only the site and the utilities. San Jose says a complete package can be permitted the same day as its review meeting, and Mountain View cites up to 30 days saved. We build pre-approved sets at the same fixed-price standard as custom work.
Unpermitted units.
California's amnesty law generally bars a city from refusing to legalize an ADU built before 2020 only because it lacks a permit, unless it is substandard on health and safety. We survey the unit, explain what legalization requires and manage the process, so it can rent openly, appraise and pass a sale without surprises.
How much does an ADU cost in the Bay Area?
Detached ADUs generally run $350,000 to $500,000, about $500 to $650 per square foot. Garage conversions run $190,000 to $250,000 because the structure and foundation already exist.
Can I build an ADU on my lot?
Almost always. State law requires cities to allow at least one ADU on a single-family lot and to approve a compliant application within 60 days. We check size, placement and utility connections against your parcel.
Do I have to live on the property?
Owner-occupancy requirements were removed for ADUs permitted under the current framework. The rules keep changing, so we confirm them for your parcel and permit date.
Can I rent the ADU?
Long-term rental is allowed. Short-term rentals under 30 days are restricted in some cities, San Jose among them.
Does an ADU need a separate meter and address?
A separate meter is not required, but it simplifies renting. The unit does need its own address for utilities and mail; we handle the assignment and the utility coordination.
Related
Related services.
Get in touch
Contact us.
Tell us what you are planning. We will walk the space and put a fixed price in writing.
We call back within one business day, walk the space with you, and put a fixed price in writing. Nothing to sign before then.


